It was an impressive achievement, one we look back on with pride. The Verdasol team, consisting of 10 dedicated professionals, faced the challenge to install more than 400 solar panels on the roof of the Orange Hotel in Scheveningen. With passion for sustainability and a determined mind, we started this ambitious project that paves the way for a greener future.

Days of Preparation

The preparation for this extensive task began weeks in advance. It was crucial to plan every detail and ensure that everything would go smoothly. Our team carefully analysed the roof, the electrical infrastructure and the optimal layout for the solar panels. We knew precision would be the key to success.

The Great Day

When the big day finally dawned, we were full of energy and determined to achieve our goal. We met early in the morning, armed with tools and expertise. As the sun rose slowly, we gave the kickoff for what would become an intense but satisfying experience.

A Partnership

The strength of cooperation was clearly visible. Each team member had its specific role and responsibilities, but we worked as one. While some installed the solar panels on the roof, others provided the electrical wiring and connection. It was a well-oiled machine that turned to determination and teamwork.

Proud of Our Devotion

As the days progressed, we saw the transformation happening before our eyes. The roof turned into a field of shimmering solar panels, ready to capture the power of the sun and convert into clean energy. We knew we made the world a little greener, and that gave us wings.

The Reward of Sustainability

After three intense days of hard work, the moment of truth was there. We put the latest signatures on our installation and turned on the solar panels. The converters began to buzz and within a few moments the panels began to generate energy. Mission accomplished!

On the Road to a Greener Future

This experience has motivated our team more than ever to continue our work. We believe in the power of renewable energy and are determined to contribute to a cleaner and greener future for all of us. With each solar panel installed, we are taking this future one step closer.

We are proud of what we have achieved, but we are even more excited about what the future has in store. Together we continue to work for sustainability and strive for a world where green energy is the norm. The installation of these 400 solar panels is just part of our adventure, and we look forward to the journey ahead. Together we are building a more sustainable world.

See here some photos for an impression of our days on the roof of the Orange Hotel